Availability estimation of nuclear reactor with standby generators by employing pre-emptive resume repair policy
Downloads
Abstract
In this paper, the authors have studied about availability estimation of nuclear power generation plants. If any
of the subsystems stops working, then the whole system gets fail. Pre-emptive resume policy has been used
for repair purposes, for failures follow exponential time distribution, whereas all repairs follow general time
distribution. The system under consideration is non- Markovian the supplementary variable technique has been
used for the mathematical formulation of the model. Laplace transforms are being utilized to solve mathematical
equations. Some particulate cases and asymptotic behavior of the system have also been derived to improve
the model’s practical importance. The expression for the availability function has been computed. A numerical
problem, together with its graphical representation, has been appended in the end to highlight actual results.
Keywords:
Nuclear reactor, generation plantsMathematics Subject Classification:
Mathematics- Pages: 829-835
- Date Published: 01-01-2021
- Vol. 9 No. 01 (2021): Malaya Journal of Matematik (MJM)
Barlow, R. E. Mathematical reliability theory: from the beginning to the present time. In Mathematical and Statistical Methods in Reliability, (2003), (3-13).
Biswas, A., and Sarkar, J. Availability of a system maintained through several imperfect repairs before a replacement or a perfect repair. Statistics and Probability Letters, $50(2)(2000), 105-114$
Finkelstein, M. S. Reliability modelling for biological ageing. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, $222(1)(2008), 1-6$
Fragola, J. R. Reliability and risk analysis data base development: an historical perspective. Reliability Engineering and System Safety, 51(2)(1996), 125-136.
Garg, H., and Sharma, S.P. Behavior analysis of synthesis unit in fertilizer plant. International Journal of Quality and Reliability Management, (2012).
Guo, H. R., Liao, H., Zhao, W., and Mettas, A. A new stochastic model for systems under general repairs. IEEE Transactions on Reliability, 56(1)(2007), 40-49.
Gutiérrez-Pulido, H., Aguirre-Torres, V., and Christen, J. A. A practical method for obtaining prior distributions in reliability. IEEE Transactions on Reliability, 54(2)(2005), $262-269$.
Huang, H. Z. Reliability analysis method in the presence of fuzziness attached to operating time. Microelectronics Reliability, 35(12)(1995), 1483-1487.
Islamov, R. T. Using Markov reliability modelling for multiple repairable systems. Reliability Engineering and System Safety, $44(2)(1994), 113-118$.
Kumar, A., and Saini, M. Fuzzy availability analysis of a marine power plant. Materials Today: Proceedings, 5(11)(2018), 25195-25202.
Mahmoud, M. A. W., and Esmail, M. A. Stochastic analysis of a two-unit warm standby system with slow switch subject to hardware and human error failures. Microelectronics Reliability, 38(10)(1998), 1639-1644.
Mokaddis, G. S., Tawfek, M. L., and Elhssia, S. A. M. Cost analysis of a two dissimilar-unit cold standby redundant system subject to inspection and two types of repair. Microelectronics Reliability, 37(2)(1997), 335-340.
Pandey, D., Jacob, M., and Yadav, J. Reliability analysis of a powerloom plant with cold standby for its strategic unit. Microelectronics Reliability, 36(1)(1996), 115-119.
Pandey, D., Jacob, M., and Yadav, J. Reliability analysis of a powerloom plant with cold standby for its strategic unit. Microelectronics Reliability, 36(1)(1996), 115-119.
Qamber, I. S. Reliability study of two engineering models using LU decomposition. Reliability Engineering and System Safety, 64(3)(1999), 359-364.
Saini, M., Kumar, A., and Shankar, V. G. A study of microprocessor systems using RAMD approach. Life Cycle Reliability and Safety Engineering, (2020), 1-14.
Tam, S. M. Demonstrated reliability of plasticencapsulated microcircuits for missile applications. IEEE Transactions on Reliability, 44(1)(1995), 8-13.
Yeh, W. C., Lin, Y. C., Chung, Y. Y., and Chih, M. A particle swarm optimization approach based on Monte Carlo simulation for solving the complex network reliability problem. IEEE Transactions on Reliability, $59(1)(2010)$, $212-221$
Zhang, T., and Horigome, M. Availability and reliability of system with dependent components and time-varying failure and repair rates. IEEE Transactions on reliability, $50(2)(2001), 151-158$
Arora, J. R. Reliability of a 2-Unit Priority-Standby Redundant System with Finite Repair Capability. IEEE Transactions on Reliability, 25(3)(1976), 205-207.
Arora, J. R. Reliability of a 2-Unit Priority-Standby Redundant System with Finite Repair Capability. IEEE Transactions on Reliability, 25(3)(1976), 205-207.
Lal, K. Stochastic analysis of temperature spikes contribution towards the damage in a component exposed to nuclear radiation environment. Microelectronics Reliabil. ity, $18(3)(1978), 281-284$
Dhillon, B. S. Unified availability modeling: a redundant system with mechanical, electrical, software, human and common-cause failures. Microelectronics Reliability, $21(5)(1981), 653-659$.
Metrics
Published
How to Cite
Issue
Section
License
Copyright (c) 2021 MJM
This work is licensed under a Creative Commons Attribution 4.0 International License.