A stochastic model for a single grade system with backup resource of manpower
Downloads
DOI:
https://doi.org/10.26637/mjm203/009Abstract
In this paper, an organization with single grade subjected to exodus of personnel due to policy decisions taken by it, is considered. In order to avoid the crisis of the organization reaching a breakdown point, a suitable univariate policy recruitment based on shock model approach and cumulative damage process is suggested. A mathematical model is constructed and a performance measure namely the mean time to recruitment is obtained. The analytical results are numerically illustrated and the influences of nodal parameters on the performance measures are studied and relevant conclusions are presented.
Keywords:
Single grade system, Univariate policy of recruitment, shock modelMathematics Subject Classification:
90B70, 91B40, 91D35- Pages: 243-248
- Date Published: 01-07-2014
- Vol. 2 No. 03 (2014): Malaya Journal of Matematik (MJM)
D.J. Bartholomew, Stochastic Model for Social Process, 2nd Edition, John Wiley and Sons, New York, 1973.
D.J. Bartholomew and A.F.Forbes, Statistical Techniques for Manpower Planning, John Wiley, Chichester, 1979.
R. Sathyamoorthi and R. Elangovan, A shock model approach to determine the expected time to recruitment , Journal of Decision and Mathematical Sciences, 2(1-3)(1998), 67-68.
R. Sathyamoorthi and S. Parthasarathy, On the expected time to recruitment in a two grade marketing organization, IAPQR Transactions, 27(1)( 2002), 77-80.
A. Srinivasan and V. Saavithri, Cost analysis on univariate policies of recruitment, International Journal of Management and Systems, 18(3)(2002), 249-264.
A. Srinivasan and K. Kasturri, Expected ttime for recruitment with correlated inter-decision times of exits when threshold distribution has SCBZ property, Acta Ciencia Indica, XXXI M.(1)(2005), 277-283.
A. Srinivasan, K.P. Uma, K. Udayachandrika and V. Saavithri, Expected time to recruitment for an univariate policy when threshold distribution has SCBZ Property, Proceedings of the third national Conference On Mathematical and Computational Models, Narosa Publishing Book House, New Delhi, 2005, 242-246.
N. Vijayasankar, R. Elangovan and R. Sathiyamoorthi, Determination of expected time to recruitment when backup resource of manpower exists, Ultra Scientist, 25(1)B(2013), 61-68.
- NA
Similar Articles
- Manoj Kumar Chande, An improved proxy blind signature scheme based on ECDLP , Malaya Journal of Matematik: Vol. 2 No. 03 (2014): Malaya Journal of Matematik (MJM)
You may also start an advanced similarity search for this article.
Metrics
Published
How to Cite
Issue
Section
License
Copyright (c) 2014 MJM
This work is licensed under a Creative Commons Attribution 4.0 International License.