[1]
G. Ayyappan and R. Supraja 2018. Analysis of an $M^{[X]} / G_1(a, b), G_2(a, b) / 1$ unreliable G-queue with optional re-service, Bernoulli vacation, delay time to two phase of repair. Malaya Journal of Matematik. 6, 03 (Jul. 2018), 664–667. DOI:https://doi.org/10.26637/MJM0603/0031.