(1)
V. Vinoba; N. Selvamalar. Improved Makespan of the Branch and Bound Solution for a Fuzzy Flow-Shop Scheduling Problem Using the Maximization Operator.
Malaya J. Mat.
2019
,
7
, 91-95.