[1]
V. Vinoba and N. Selvamalar, “Improved makespan of the branch and bound solution for a fuzzy flow-shop scheduling problem using the maximization operator”, Malaya J. Mat., vol. 7, no. 01, pp. 91–95, Jan. 2019.